News

5/14/10 - Toshiba awards us Top Field Service Company in Southeast US. As a sales firm that also services we are proud to recieve this award.

9/23/09 - Toshiba expands Ultra High Efficiency G9000 UPS to 750 kVA/750 kW - 97% efficiency at full load, 95.8% at 20% load. Leads industry!

8/1/09 Wilson Engineerd & Toshiba UPS Stimulus Plan issued through year end on select configurations. Save Money - Ask us.

7/19/09 - New website placed on web.

10/1/08 - Toshiba introduces new ultra efficient technology for UPS in the 80 to 225 kVA range. Operating savings save ten's of thousands of dollars for users over the products typical life. Go Green!

Go Green in Your Data Center

Visit GreenITCenters.com

Save Energy with Ultrasonic Humidification

Replace UPS Batteries with Flywheels

Generators

Overview - Standby Generators

The critical nature and 7 x 24 operation of IT equipment necessitates backup power to be available at many IT Centers. Generator selection and design is not well understood by many users. Many critical pieces of information should be gathered and known prior to generator selection. Our background and experience is a good resource in generator applications. Items that should be taken into consideration include:

We generally assist in engineering assistance doing field surveys of your requirements and then to develop a needs listing or specification for procurement. We can work with you solely on a engineering basis or a full turnkey installation basis. Each generator application is a custome process. Please contact us if you have generator needs and we'll be happy to discuss your specifics.